Decision Tree: Retention Time Shift

Symptom: peaks move earlier/later; peak ID becomes wrong; method fails.

Do not re-identify peaks until carrier/temperature stability is confirmed.

Step-by-step isolation

1) Check carrier pressure/flow stability (most common cause): verify supply, regulator hunting, flow controller status.
2) Verify oven temperature: confirm correct setpoint, no deviation alarms, stable trend.
3) Check column/valve configuration: ensure correct stream selected, correct method loaded, valve timing unchanged.
4) Check for leaks/restrictions: leaks usually shift RT; restrictions/plugging can also shift RT and distort peaks.
5) Confirm carrier type/purity: wrong carrier or contamination changes retention behavior and baseline.
6) If RT still shifted after stability checks:
  • Suspect column aging/contamination or oven sensor drift.
  • Verify with calibration standard chromatogram and compare.
7) Corrective actions:
  • Stabilize regulators/flows, fix leaks, replace filters.
  • Service oven control loop if temp drift exists.
  • Clean/replace column only after confirming utilities are correct.