Decision Tree: Communication / DCS

← Back to Alarms Hub ABB GC Codes → Back to PGC5000C
Goal: Restore stable data updates to DCS / PLC (values, quality, and timing).
1) Confirm analyzer is running and the last analysis time updates.
2) Verify IP, subnet, gateway, and physical network link.
3) Confirm protocol settings match the DCS configuration (Modbus, OPC, etc.).
4) Check mapping, scaling, data types, and quality/status mapping.
5) Ensure polling interval matches the GC cycle time (avoid timeouts).