Decision Tree: Valve / Sequence
Goal:
Confirm valves switch correctly
and method timing is consistent.
1) Check instrument air supply
(clean, dry) and pressure stability.
2) Verify solenoid actuation
(click or indicator).
Check wiring or power if dead.
3) If valve moves but results are wrong:
suspect sticking, leakage,
or contamination.
4) Verify method sequence timing
against the last known
good configuration.
5) Run 2–3 cycles
and confirm repeatable peaks.