Decision Tree: Valve / Sequence
Goal:
Ensure valve switching and
sequence timing are correct.
1) Verify instrument air
quality and pressure.
2) Check solenoid actuation
and associated wiring.
3) If peaks are wrong or missing:
suspect sticking valves,
leakage, or contamination.
4) Confirm method
sequence timing.
5) Run 2–3 cycles
and verify repeatability.