Decision Tree: Carrier / Pressure / Flow
Goal:
Stabilize carrier pressure and remove leaks
before running field results.
1) Confirm carrier source
and valve are open.
2) Verify regulator stability
(no hunting).
3) Leak test all
quick-connects and fittings.
4) Confirm inlet pressure
is stable.
5) Run 2–3 cycles
and verify repeatability.