Decision Tree: Valve / Sequence
Goal:
Confirm valve switching and timing
so peaks are repeatable.
1) Verify valve actuation
and solenoid operation.
2) Check for sticking,
leakage, or contamination.
3) Confirm method
sequence timing.
4) Re-run a full
analysis cycle.
5) Confirm peak
repeatability.